GainsboroughFour-bed HMOSurvey: 2.5 hours · Remediation: 6 days

Student HMO in Gainsborough — Condensation & Black Mould Remediation

A four-bed student HMO developed black mould on bedroom ceilings and bathroom walls. Our comprehensive report identified ventilation failure and thermal bridging. LWR Group installed PIV and upgraded insulation.

Transformation

Drag to reveal the before & after

Illustrative — swap in real project photos when uploaded.

The Problem

Black mould spreading on north-facing bedroom ceilings, mould on bathroom silicone and tile grout, tenants reporting respiratory irritation.

What We Found

Inadequate mechanical ventilation, missing loft insulation over bedrooms (thermal bridging), disconnected bathroom extractor fan, RH readings above 70%.

The Solution

Positive Input Ventilation (PIV) installed in loft, cold-roof insulation upgraded to 300mm, new extractor fan in bathroom ducted externally, antimicrobial treatment and repaint.

The Outcome

RH dropped to 52%, no mould recurrence at 12-month check. Tenants renewed for another year.